Hello Karki,
Greetings from Samoa.
(a) How long did it take to de-water the biodigester
pit prior to construction?.
(b) What was the volume of water that was removed?.
(c) How did you disposed of the water?.
(d) In relation to the water table, apart from de-watering
were there
any other special consideration
during construction of the biodigester?
(e) What is the effect of the water table on other
subsystems, in
particular the drying or
compost pit.
(f) The soak pit in your flow chart seems redundant
as an IBS unit?.
(g) What is the life span of compost materials
in the compost pit.
(h) What is the cost of construction of all the systems?
and expected return to capital?
Have a nice day.
Asifo O. Ajuyah (Ph.D.)
Senior Lecturer Pig and Poultry Production
The University of the South Pacific
School of Agriculture, Alafua Campus, Samoa